YTSING-YD-7102 Full Automatic top hat purlin
Roll Forming Machine Profile drawing(for your reference)
We can design the machine according to your specific profile drawing.
Complete Line Consist Of
A - DECOILER................................................................................................PASSIVE DECOILER B - INFEEDER APPLICATOR..........................................................................TO GUIDE MATERIA C - ROLL FORMING...........................................................................TO ROLL AVOVE PROFLES D - HYDRAULIC STOP TO CUT...........................................................CUT AT DESIRED LENGTH E - OUTPUT TABLE............................................................SUPPORT THE FINISHED PRODUCTS |
Flow chart
Details of machine and introduction of our factory
Passive decoiler |
Max. width of coil can be loaded | 400mm |
Mandrel Nominal Dia | 280mm |
Inner diameter | 360-508mm |
Max.out diameter | 1600mm |
Feeding applicator |
Feeding roller diameter | 76mm |
Material of roller | CR12 steel, HRC58-62 |
Roll forming line |
No. of work station | 14 sets |
Required motor capacity | 5.5 K.W |
Thickness of coil | 0.3-1.2mm |
Max. Roll shafts Dia | 76mm |
Roller material | CR12, CNC lathes, double machining, quenched 58-62 |
Transducer | Panasonic or Simens |
Transmission | Gear box driving system |
Hydraulic cutting |
Max.thickness | 1.2mm |
Cutting material | Cr12, MOV, quenched 58-62 |
Cutting system | Hydraulic die cutting |
Output table Cut the finished top hat sheets according to your demands.
PAYMENT 30% paid by TT in advance and the balance paid by TT before shipping AFTER SALE SERVICE - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. - Training time: 5 days. - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) Welcome to contact with us and visit our factory!
Contact us if you need more details on Top Hat Roll Forming Machine. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Top Hat Purlin Machine、
Top Hat Roll Former. If these products fail to match your need, please contact us and we would like to provide relevant information.
Product Categories : Stud And Track Roll Forming Machine